
Install the NEW secondary air injection-(SAI)check valve gasket-(1).Install the SAI check valve-(2).
Caution:Refer toFastener Caution.
Install the SAI check valve bolts-(3) and tightento25-Y(18-lb-ft).
Secondary Air Injection Check Valve Installation - Bank 1 Emissions Air Injection
Water Outlet Installation Engine CoolingInput, Reaction, and Output Carrier Disassemble Automatic Transmission Unit
Input, Reaction, and Output Carrier DisassembleCalloutComponent Name1Output Carrier AssemblyNote:The 6T30 and 6T40 have 4-pinions.The 6T45 and 6T50 have 5-pinions.2Output Carrier Thrust Bearing Assembly3Input Sun Gear Thrust Bearing Assembly4Input Carrier AssemblyNote:The 6T30 and 6T40 have 4-pinion ...