Most effective if done within 5 minutes of lubeapplication.Tire exercising is required for all tires and should be doneprior to balancing and checking for RFV.Lack of bead exercising will produce excessive RFVreadings.Bead exercising can be performed using any tire mountingequipment equipped with upper and lower bead rollers.Bead exercising is to be performed on the inflated tire atplacard pressure.
Radiator Inlet Hose Replacement (LFX) Engine Cooling Radiator
Special Tools J 38185 Hose Clamp PliersRemoval ProcedureDrain the cooling system. Refer toCooling System Draining and Filling.Remove the intake manifold cover. Refer toIntake Manifold Cover Replacement.Disengage tension on the radiator inlet hose clamp-(1) at the radiator using J 38185 Hose Clamp Pl ...